Installing the first

In the end we worked out that the batons which were underneath the unit, would make tiles stick-up (either side of the tunnel). So we found that it was better to place the unit directly on-to the under-felt, and having the the batons meeting the sides. By the end of the third day we couldnt complete the installation, but had it mostly done.

The first sun-tunnel nearly done

So now with one more day, we worked on finishing the first unit. This basically took the rest of the day but looked fairly good. This is how it looked at the end of the fourth day.

The first sun-tunnel all done

Hopefully the second tunnel shouldnt take as long, and we can get it install in 2 days - we dont really have a choice, as dad doesnt have any time off-work available.