Long Range Frame Shift Drive Interdictor modification




Below are all the blue-print plans for the Long Range Frame Shift Drive Interdictor modification.

Grade 1

Effects
Power Draw +10%
Range +20%
Facing Limit -10%
Mass +10%
Cost
1 x link Unusual Encrypted Files


Grade 2

Effects
Power Draw +20%
Range +30%
Facing Limit -15%
Mass +15%
Cost
1 x link Atypical Disrupted Wake Echoes
1 x link Tagged Encryption Codes


Grade 3

Effects
Power Draw +30%
Range +40%
Facing Limit -20%
Mass +20%
Cost
1 x link Anomalous Bulk Scan Data
1 x link Open Symmetric Keys


Grade 4

Effects
Power Draw +40%
Range +50%
Facing Limit -25%
Mass +25%
Cost
1 x link Strange Wake Solutions
1 x link Atypical Encryption Archives


Grade 5

Effects
Power Draw +50%
Range +60%
Facing Limit -30%
Mass +30%
Cost
1 x link Classified Scan Databanks
1 x link Eccentric Hyperspace Trajectories
1 x link Adaptive Encryptors Capture