Increased Range Frame Shift Drive modification
Below are all the blue-print plans for the Increased Range Frame Shift Drive modification.
Effects
| Power Draw | +3% |
| Optimised Mass | +15% |
| Integrity | -3% |
| Mass | +10% |
Cost
1 x Atypical Disrupted Wake Echoes |
Effects
| Power Draw | +6% |
| Optimised Mass | +25% |
| Integrity | -6% |
| Mass | +15% |
Cost
1 x Atypical Disrupted Wake Echoes |
1 x Chemical Processors |
Effects
| Power Draw | +9% |
| Optimised Mass | +35% |
| Integrity | -9% |
| Mass | +20% |
Cost
1 x Chemical Processors |
1 x Phosphorus |
1 x Strange Wake Solutions |
Effects
| Power Draw | +12% |
| Optimised Mass | +45% |
| Integrity | -12% |
| Mass | +25% |
Cost
1 x Chemical Distillery |
1 x Eccentric Hyperspace Trajectories |
1 x Manganese |
Effects
| Power Draw | +15% |
| Optimised Mass | +55% |
| Integrity | -15% |
| Mass | +30% |
Cost
1 x Arsenic |
1 x Chemical Manipulators |
1 x Datamined Wake Exceptions |
Cookie settings
Privacy policy.
Login / Register
Atypical Disrupted Wake Echoes